3 Using the numeric keypad, press ‘
Commissioning option and confirm using the ‘
pushbutton. The Commissioning option is
automatically displayed if a Level 3 passcode was
previously entered.
[S1 COMM]
5
3:CBE Rules
If a Level 2 passcode was entered the LCD prompts:
COMMISSION MODE ACCESS
Enter Level 3 Passcode:
4 Enter the correct Level 3 passcode using the numeric
keypad and confirm using the ‘
press ‘
[S1 COMM]
3:CBE Rules

4.7 Commissioning Tests

The following paragraphs list tests that should be performed
after configuration has been completed. A successful result
from these tests indicates that the panel is working properly.
4.7.1 Test LEDs
This procedure is described in the ID50 Series Panel -
Operating Manual, 997-264, Section 4.8.1.
4.7.2 Test LCD
This procedure is described in the ID50 Series Panel -
Operating Manual, 997-264, Section 4.8.2.
4.7.3 Test Zones
This procedure is described in the ID50 Series Panel -
Operating Manual, 997-264, Section 4.8.3.
4.7.4 Test Auto High Test
This procedure is described in the ID50 Series Panel -
Operating Manual, 997-264, Section 4.8.4.
4.7.5 Test Outputs
This procedure is described in the ID50 Series Panel -
Operating Manual, 997-264, Section 4.8.5.
4.7.6 Test Buzzer
This procedure is described in the ID50 Series Panel -
Operating Manual, 997-264, Section 4.8.6.
4.7.7 Test Keyboard
This procedure is described in the ID50 Series Panel -
Operating Manual, 997-264, Section 4.8.7.
34
1:Setup
2:Circuit
4:Zones
5:Access
. . . .
’ to cancel the last operation).
4
1:Setup
2:Circuit
4:Zones
5:Access
’ to select the
6
5
× : More
< : BackSp
’ pushbutton (or
5
× : More

Advertisement

Table of Contents
loading

This manual is also suitable for:

Id60

Table of Contents