ABB 2600T Series Instruction Manual page 123

266 with foundation fieldbus communication
Table of Contents

Advertisement

2 6 0 0 T S E R I E S | P R E S S U R E T R A N S M I T T E R S | O I/ 2 6 6/ F F - E N R E V. E
IMPORTANT
The second part of the operations is executed in ON-Line. ON line means that the real device has to be connected on the FF H1
network to the host.
Assignment of the FF devices
Verify that the 266 PdP appears in the "live List" of the Linking Device.
Then with the right mouse click select "Pre-commissioning" and then with the left mouse click select "Assign device"
The current configuration of the device appears in the top of the "Device Assignment for: xxxxx" where, in the grey field is shown
the configured/desired settings of the device to be commissioned in term of Address, TAG, Device Type and Device_ID, while in the
white field are listed all the devices in the live list with their real settings.
Select the new device to be commissioned/assigned with the mouse and press "Assign".
123

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

266

Table of Contents