Multi-Point Lock
FM7300 Series and BL7300 Series
Installation Instructions
3
Installation (cont.)
n
Electronic Access Control (EAC) Shield (if applicable)
• Install the EAC shield (provided) over the inside controller. (Figure 28)
• Drill and tap the door for #8-32 machine screws (provided).
IMPORTANT
EAC shield MUST be centered on controller.
4
Optional Installation
a
Dogging Indicator Installation
• Ensure the door is latched and all bolts are projected.
• Place the plastic field template on the pin in the top rod through the oval cut-out in the door.
(Figure 29)
1-800-727-5477 • www.sargentlock.com
Copyright © 2020 SARGENT Manufacturing Company. All rights reserved. Reproduction in whole or in
part without the express written permission of SARGENT Manufacturing Company is prohibited.
Front View
Note:
Slots face up.
Figure 28
Side View
Pin
Figure 29
14
A8220D 04/20