Assa Abloy Corbin Russwin FE6700 Series Installation Instructions Manual

Multi-point lock for window shutter applications

Advertisement

Quick Links

FE6700 Series Multi-Point Lock
Installation Instructions for
Window Shutter Applications
FM 327 08/17
(617419200)
Recommended Installation:
Install FE6700 so that the
deadbolt is equidistant from
the top and bottom of the
shutter.
ASSA ABLOY, the global leader in door opening solutions
1

Advertisement

Table of Contents
loading

Summary of Contents for Assa Abloy Corbin Russwin FE6700 Series

  • Page 1 FE6700 Series Multi-Point Lock Installation Instructions for Window Shutter Applications FM 327 08/17 (617419200) Recommended Installation: Install FE6700 so that the deadbolt is equidistant from the top and bottom of the shutter. ASSA ABLOY, the global leader in door opening solutions...
  • Page 2: Table Of Contents

    Step 9 – Assemble the Top Latc h to the Frame …………………………... 9 Step 10 – Installation of Deadbolt Strike ………………………………… 10 Step 11 – Install the Bottom Strike ……………………………………… 10 Installation Jig Components Drill Guide for Deadbolt Case ASSA ABLOY, the global leader in door opening solutions...
  • Page 3: Step 1 - Installation Of Deadbolt Assembly

    Note the orientation of the bottom bolt assembly the double screw head side (not shown in this image) should be facing the hinge side of the shutter. Continue on next page…………. ASSA ABLOY, the global leader in door opening solutions...
  • Page 4: Step 3 - Installation Of To P Pusher Assembly

    It should be on the same side as the plunger pin. · Fasten the Top Strike plate and Top Pusher Assembly to the top of the shutter using (2) 5/16-18 by 1" Flat Head Cap Screws. ASSA ABLOY, the global leader in door opening solutions...
  • Page 5: Step 4 - Aligning Assemblies In Preparation For Drilling And Pinning

    The lifting platform jig will now be in position to allow sliding the lifting platform (shown in step 2) so that it rests against the shelf of the jig. Continued on next page…………. ASSA ABLOY, the global leader in door opening solutions...
  • Page 6 · Next secure the platforms position by tightening the cone point set screw (item 2). This will assure the point on the set screw embeds itself firmly into the bottom rod. ASSA ABLOY, the global leader in door opening solutions...
  • Page 7: Step 5 - Applying The Drill Jig For Proper Drilling

    Guides clamping screw so that it will firmly secure the jig around the shutter. · Using the Drill Guide Hole, drill a 1/8" hole (drill provided with Jig Components) thru both sets of rods. ASSA ABLOY, the global leader in door opening solutions...
  • Page 8: Step 6 - Pinning The Rods To Engage The Deadbolt Lever

    · Visually align the mounting holes of the inside escutcheon to the mounting posts from the outside escutcheon. · Insert 4 mounting screws ¼" – 20 by 1 ¾" and tighten screws. ASSA ABLOY, the global leader in door opening solutions...
  • Page 9: Step 8 - Installation Of Cylinder In Outside Trim (Optional)

    Step 9 – Assemble the Top Latch to the Frame · Assembly the top latch into the top of the frame using (4) ¼" – 20 by 1" Flat Head Cap Screws. The angled surface should face the shutter. ASSA ABLOY, the global leader in door opening solutions...
  • Page 10: Step 10 - Installation Of Deadbolt Strike

    Telephone: 888-607-5703 Fax: 800-828-7277 Copyright © 2017 Corbin Russwin, Inc., an ASSA ABLOY Group company. All rights reserved. Reproduction in whole or in part without the express written permission of Corbin Russwin, Inc. is prohibited. ASSA ABLOY is the global leader in door opening solutions, dedicated to satisfying end-user needs for security, safety and convenience.

Table of Contents