4. MECHANICAL INSTALLATION

F
Always perform the work with the power supply
disconnected.
F
Mark off the work site and prohibit access/tran-
sit. Before the barrier is fixed to the foundation there
are risks of tripping and falls.
When working inside the enclosure there are risks of
cutting, shearing, crushing hands due to the presence
of moving parts. Until the installation is completed,
the partially installed barrier must always be left
blocked and with the door and upper cover always
closed to prevent access to the electronic parts and
the moving mechanical pars.
Never install the arm before securing the barrier body
and checking it.
Until the installation is complete, never leave the
barrier unguarded with the arm mounted. If the
arm is mounted, the barrier must be locked with
the arm open.
If installation is outside, it must be done in good
weather without rain or gusts of wind.
raining, an adequate shelter for the barrier must be
made until the mechanical and electronic installation
is complete.
Never handle the barrier by holding the control
board support.
B614

4.1 TOOLS REQUIRED

Wrench
8-13-17-19
Allen key
4-6
Level
TOOL with TORQUE ADJUSTMENT
Where necessary for safety, a torque wrench with the
specified tightening torque will be shown.
FASTENING TORQUE VALUE
The torque wrench and the tightening torque in Nm
is shown in the figures. E.g.: HEX WRENCH 6 set at
2.5 Nm
If it is
17
2.5
Nm
6
532297 - Rev.D