ROUNTING THE CABLES INSIDE THE BARRIER

51.18 in (130 cm) of cable are necessary.
1. (1 3 ) Arrange the cables inside the barrier. Se-
cure the cables with the cable ties provided in
postions 1, 2 and 3.
2. ( 1 4 ) Remove the bolt with washer 1. Open
cable strain relief 2. Bring the cables to the board.
3. Use the screw and washer 1 to close the cable
strain relief.
The electrical connections must be made after com-
pleting the mechanical installation