Installation; Facilities - FAAC J355HA M30-P1 User Manual

Bollard
Table of Contents

Advertisement

2. INSTALLATION

2.1 FACILITIES

For draining, use a Ø 100 flexible tube. Dig up to a depth of about 1.8 m
IMPACT DIRECTION
UNPROTECTED AREA
PROTECTED AREA
800
3200
Excavation
Ground
900
Dimensions in mm
3
J355HA M30-P1
6
732768 - Rev.C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents