Installation Requirements; Mechanical Requirements - FAAC B614 Manual

Hide thumbs Also See for B614:
Table of Contents

Advertisement

3. INSTALLATION REQUIREMENTS

3.1 MECHANICAL REQUIREMENTS

Before starting any work make sure that all the fol-
lowing conditions are present, to ensure a safe and
reliable installation of the B614 barrier operator.
!
There is firm ground to support the weight of the
barrier with flat, horizontal paving. There must be no
chance of water accumulating in the installation area.
For the installation of detection loops, refer to the
specific instructions.
There is a safety area between the wall (or other fixed
element) and the end of the arm, to protect against
the risk of people becoming trapped/crushed.
There are safety areas between the fixed and moving
parts to prevent hands from being crushed.
There is enough working space for the installation
activities and subsequent maintenance operations,
bearing in mind the opening of the service door
and the positioning/removal of the cabinet and any
other elements.
There are no fixed or mobile obstacles to the move-
ment of the arm (e.g.: branches, overhead cables,
ceilings).
If the installation area presents the possibility of
vehicle impact, provide adequate structures to protect
the barrier body.
B614
14.2 in
(360 mm)
9 in
(230 mm)
14
11.8 in
(300 mm)
33.8 in
(860 mm)
12 in
(305 mm)
6
532297 - Rev.D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents