Ups Installation - Delta DPS Series User Manual

Hide thumbs Also See for DPS Series:
Table of Contents

Advertisement

WARNING: 
1. Do not use air conditioners or similar equipment to blow into the rear of the
UPS.
2. Do not hinder ventilation of the UPS.
• Keep the installation area clean. Please note that wiring routes must be hermetic to
prevent possible damage from rodents.
• Keep the installation area's temperature around 25 ° C (77 ° F) and humidity within 95%.
The highest operating altitude is 1000 meters (3280 ft) above sea level.
• For safety concerns, we suggest that you:
1. Equip surroundings of the installation area with CO
2. Install the UPS in an environment where fireproof materials are used to construct the
walls, floors and ceilings.
3. Install the UPS on a floor that is made of noncombustible materials.
• Do not allow unauthorized personnel to enter the installation area and assign specified
personnel to keep the UPS keys.
5.3

UPS Installation

NOTE:
Please use appropriate equipment (e.g. forklift) to move the UPS.
Please follow the steps below:
Step 1
Before installing the UPS in a designated installation area, please double-check whether the
area's floor weight loading is sufficient to bear the UPS, external battery cabinet(s), external
maintenance bypass cabinet and handling equipment (e.g. forklift) to avoid accidents.
Step 2 (only for 1000/ 1200kVA UPS)
After the system cabinet (already connected with the power cabinet before shipment) and
I/O cabinet are moved to the designated installation area, open the I/O cabinet's front door
(❶), remove the I/O cabinet's rear panel (❷), and use the provided M8 screws to join the
system cabinet and I/O cabinet together (❸).
or dry powder fire extinguishers.
2
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dps-800kDps-1000kDps-1200k

Table of Contents