Eco Mode Start-Up Procedures - Delta DPS Series User Manual

Hide thumbs Also See for DPS Series:
Table of Contents

Advertisement

Step 4
After the UPS runs in Bypass mode, switch OFF the external maintenance bypass cabinet's
Manual Bypass Breaker or Switch (Q3).
Step 5
Tap the ON/ OFF Button (
Step 6
After the inverter turns on, the UPS will run in On-Line mode, the LCD screen will show as
below, and the tri-color LED indicator will illuminate green.
6.2.5

ECO Mode Start-up Procedures

WARNING: 
Before turning on the UPS, please read 6.1 Pre Start-up & Pre Turn-off Warnings
thoroughly and ensure that the precautions and instructions have been followed.
Step 1
Ensure that the external maintenance bypass cabinet's Manual Bypass Breaker or Switch
(Q3) is in the OFF position.
Step 2
Switch ON every external battery cabinet's breaker (Q5).
Step 3
Switch ON the external maintenance bypass cabinet's Input Breaker or Switch (Q1) and
Bypass Breaker or Switch (Q2). If the bypass input is within the normal range, the UPS will
run in Bypass mode.
Step 4
Switch ON the external maintenance bypass cabinet's Output Breaker or Switch (Q4).
) on the LCD screen.
93

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dps-800kDps-1000kDps-1200k

Table of Contents