4.3
Cable Routing for the Communication Interfaces
Regarding cable routing for the communication interfaces, follow the instructions below.
Top Cable Entry for 800/ 1000/ 1200kVA UPS
The following top cable entry procedures are applicable to 800/ 1000/ 1200kVA UPS. Below,
only the 1000/ 1200kVA UPS's drawing is taken as an example.
Open the system cabinet's front door, remove the knockout covers and install the provided
snap bushings (❶). Fix the provided cable ties in the holes, use the cable ties to fix the
cables connected to the communication interfaces (❷) and route the cables through the
snap bushings (❸).
(Figure 4-17: 800/ 1000/ 1200kVA UPS_ Top Cable Entry for
the Communication Interfaces)
48
Ultron DPS Series