Operation Tools - Gree U-Match 5 Series Manual

Table of Contents

Advertisement

GREE
3.Refer to the following table to check out the minimum construction area.
Ceiling type
Weight(kg)
Area(m
<1.224
1.224
0.956
1.4
1.6
1.8
2.0
2.2
2.4
2.6
2.8
3.0
3.2
3.4
3.6
3.8
4.0
4.2
4.4
4.6
4.8
5.0
5.2
5.4
5.6
5.8
6.0
6.2
6.4
6.6
6.8
7.0
7.2
7.4
7.6
7.8
8.0

4. Operation Tools

The following tools will be used: 1) Liquid-level gauge; 2) Screwdriver; 3) Electric driven rotary hammer; 4)
Drill; 5) Pipe expander; 6) Torque wrench; 7) Open-end wrench; 8) Pipe cutter; 9) Leak detector; 10) Vacuum
pump; 11) Pressure gauge; 12) Universal meter; 13) Hexagon wrench; 14) Tapeline.
2
Weight(kg)
<1.224
1.224
1.25
1.4
1.63
1.6
2.07
1.8
2.55
2.0
3.09
2.2
3.68
2.4
4.31
2.6
5.00
2.8
5.74
3.0
6.54
3.2
7.38
3.4
8.27
3.6
9.22
3.8
10.2
4.0
11.3
4.2
12.4
4.4
13.5
4.6
14.7
4.8
16.0
5.0
17.3
5.2
18.6
5.4
20.0
5.6
21.5
5.8
23.0
6.0
24.5
6.2
26.1
6.4
27.8
6.6
29.5
6.8
31.3
7.0
33.1
7.2
34.9
7.4
36.9
7.6
38.8
7.8
40.8
8.0
U-Match 5 SERIES UNIT SERVICE MANUAL
Wall mounted type
2
Area(m
1.43
1.87
2.44
3.09
3.81
4.61
5.49
6.44
7.47
8.58
9.76
11.0
12.4
13.8
15.3
16.8
18.5
20.2
22.0
23.8
25.8
27.8
29.9
32.1
34.3
36.6
39.1
41.5
44.1
46.7
49.4
52.2
55.1
58.0
61.0
220
Floor standing type
Weight(kg)
Area(m
<1.224
1.224
12.9
1.4
16.8
1.6
22.0
1.8
27.8
2.0
34.3
2.2
41.5
2.4
49.4
2.6
58.0
2.8
67.3
3.0
77.2
3.2
87.9
3.4
99.2
3.6
3.8
4.0
4.2
4.4
4.6
4.8
5.0
5.2
5.4
5.6
5.8
6.0
6.2
6.4
6.6
6.8
7.0
7.2
7.4
7.6
7.8
8.0
2
111
124
137
151
166
182
198
215
232
250
269
289
309
330
351
374
397
420
445
470
496
522
549

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents