GREE
Step
7. Remove the electrical box
8. Remove the evaporator
9. Remove motor's pressing
plate
10. Remove the motor and
fan
11. Install a new motor.
Removal of Fan Motor
Remark: before removing, making sure power is disconnected.
Diagram
U-Match 5 SERIES UNIT SERVICE MANUAL
151
Operation Procedure
Unscrew the screws fixing the
electrical box with a screwdriver.
Remove the electrical box.
Use a screwdriver to unscrew the
screws fixing the press plate of
connection pipe on the back of
the unit and take off the press
plate.
Unscrew the screws of
evaporator with a screwdriver
and then remove the evaporator.
Unscrew the fixing screws of the
pressing plate with a screwdriver
and then remove it.
Take off the motor and fan
directly.
Use a screwdriver to unscrew the
screws connecting the motor and
the fan.
Assemble units based on the
reverse order of this procedure
and power on the units for test.