Gree U-Match 5 Series Manual page 131

Table of Contents

Advertisement

GREE
Note: Before removing the electronic expansion valve, make sure there is no refrigerant in the pipeline and power is cut off.
Step
5. Install the new electronic
expansion valve.
6. Secure the electric box and
arrange the wires as
required.
7. Check and open the upper
and front panels.
Removal of electronic expansion valve
Picture
128
U-Match 5 SERIES UNIT SERVICE MANUAL
Work instruction
Weld the connection pipe of
electronic expansion valve.
When welding the electronic
expansion valve, the valve
should be wrapped with wet
cloth.
Nitrogen welding: the
pressure of nitrogen is
0.5±0.1kgf/ c ㎡ (relative
pressure). Note: When
welding the pipes, do not let
the flame burn the other
components.
Install the coil of electronic
expansion valve.
Put the electric box back in
place and tighten up the
screws.
Arrange the wires as original.
Check whether each
component and connection
wire is well connected.
If everything is OK, install the
upper, left and right panels.
Tighten up the screws.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents