KidKraft Cedar Summit Kingsbridge Installation And Operating Instructions Manual page 87

Table of Contents

Advertisement

Step 34: Attach Elbow Assemblies and TNR2 Slide
Support
Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the round
recess and the lock nuts go through the side with the hexagonal recess. Keep all bolts loose until
further step.
A: Attach the two remaining Elbow Assemblies as instructed in Steps 31 and 32.
B: Place TNR Brace Assembly against (2770) End Post Left so it sits under the slide. It is not attached yet.
(fig. 34.1)
C: On the fourth Elbow Assembly attached remove the pan bolt and nut which is facing the fort (installed in Step
29). (fig. 34.1) The bolt will no longer be needed, but keep the lock nut.
D: Loosely attach TNR3 Tube Support (at the slightly bent end) to the Clamp Ring using 1 (PB6) Pan Bolt (with
FW1 flat washer and the previously removed LN1 lock nut). (fig. 34.2)
E: Rotate TNR3 Tube Support and attach to (2770) End Post Left using 1 (S6) Pan Screw as shown in fig. 34.2.
F: Fully tighten screw and bolt.
Fig. 34.2
TNR 3 Tube
Support
2770
Note: Flat
end down
Remove PB1 (Pan Bolt)
first then install PB6
(Pan Bolt with FW1 flat
washer)
LN1
FW1
PB6
S6
1 x
Pan Screw
S6
1 x
Pan Bolt
PB6
(FW1 flat washer & LN1 lock nut - previously removed)
16 x
Pan Bolt
PB1
(LN1 lock nut)
2770
TNR Brace
Assembly
Hardware
87
Fig. 34.1
Attach 2
remaining
Elbow
Assemblies
Other Parts
1 x TNR3 Tube Support
4 x TNR2 Slide Clamp Ring

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cedar summit f29380

Table of Contents