KidKraft Cedar Summit Kingsbridge Installation And Operating Instructions Manual page 38

Table of Contents

Advertisement

Step 7: Tunnel Floor Assembly
Part 2
D: Flush to the ends and sides of both (9088) Tunnel Side Joist place 1 (9087) Floor Board followed by 7 (9092)
Floor Boards. Make sure the last board is flush to the ends of each (9088) Tunnel Side Joist then attach all floor
boards with 4 (S20) Wood Screws. (fig. 7.3)
E: Measure 1-1/4" (32mm) in from both ends of each (9088) Tunnel Side Joist then attach 1 Swing Bracket
to each end with 1 (WB2) Wafer Bolt (with FW2 flat washer, connects to already installed t-nuts) per bracket.
Brackets must be flush to the bottom of the boards. (fig. 7.4)
Fig. 7.3
Flush
9088
9087
9088
Fig. 7.4
9088
9088
1-1/4" (32mm)
Wood Parts
1 x
Floor Board
9087
7 x
Floor Board
9092
FW2
x 4
Flush
WB2
x 4
Hardware
32 x
4 x
9092
Wood Screw
S20
Wafer Bolt (FW2 flat washer)
WB2
38
S20
x 4 per
board
Swing
Bracket
Flush
1-1/4" (32mm)
Other Parts
4 x Swing Bracket
Flush
x 4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cedar summit f29380

Table of Contents