Step 2: Front Wall Prep
Part 2
It is important to assemble the frame on a flat, smooth surface.
D: Turn the assembly over then attach all boards with 6 (H9) Hex Bolts (with lock washer and flat washer)
connecting to the previously installed t-nuts. (fig. 2.3 and 2.4)
E: Repeat steps A-D to make a second Front Wall Assembly.
Fig. 2.3
2769
2770
Fig. 2.4
LW1
12 x
2771
2768
H9
Hardware
Hex Bolt
H9
(LW1 lock washer & FW1 flat washer)
23
H9
x 2 per board
2769
FW1