Step 5: Floor Assembly
Part 1
Complete Step 5 for both Fort Assemblies.
A: From inside of the assembly centre (2608) Floor Joist over the pilot holes in both (2768) Panel Floors in the
Swing and Front Walls, measure 5/8" (15.9mm) down from the top of boards then attach (2608) Floor Joist to
each board using the left and centre holes with 2 (S4) Wood Screws per board. (fig.5.1, 5.2, 5.3 and 5.4)
Fig. 5.1
Fig. 5.2
2608
2768
Wood Parts
2 x
Floor Joist
2608
Swing Wall
2768
5/8" (15.9mm)
Fig. 5.3
Front Wall
8 x
Front Wall
Notice holes used
S4
Hardware
Wood Screw
S4
31
2608
2768
Fig. 5.4