68 Standard Commissioning Process

Cold commissioning

All necessary inspection
Inspection of converter installation.
Check if the power cable connection on the secondar side of the integrated
transformer is correct.
passed case
NOTICE The connection of power cable must be solid. It is not allowed to have any
washer between two cable lugs. The tightening torque should follow
Hardware Manual
(2UBB004520).
failed case
ACS580MV