Insulation resistance measurement

Converter insulation resistance

Insulation resistance measurement for the converter, Please refer to
Test.

Transformer insulation resistance

If you just need to check the transformer insulation resistance, please refer to following
procedure.
1.
Stop, de-energize and ground the drive following the steps in section
the drive for maintenance
start the work.
2. Disconnect all electrical connections between integrated transformer and drive, isolate
the cables from ground or frames.
3. Disconnect and earth all external electrical connections, including power, auxiliary,
control, serial communication and ground cables. Ground the transformer cabinet.
4. Short-circuit and ground the primary side of the transformer.
5. Short-circuit and ground all auxiliary windings, heating cables and PT100.
6. Short-circuit and ground all secondary three-phase winding systems.
7. Prepare the 5kV insulation resistance tester.
8. Connect plus terminal to secondary phase A terminals, connect minus terminals to
ground.
9. Unground secondary phase A terminals.
10. Apply a test voltage of 5kV for 60 seconds.
The insulation resistance value must >500MΩ in below test condition:
Ambient temperature in the range of 0 °C to 40 °C
Relative Humidity <70%
11. Repeat steps 6 to 8 for other following three-winding systems:
Secondary phase B terminals
Secondary phase C terminals
Primary terminals
12. When finished, remove all short-circuit connections and restore to the original state.
in
ACS580MV Hardware Manual
Measurement setup for transformer
Preventive Maintenance 143
Converter Insulaiton
Shutting down
(2UBB004520) before you

Advertisement

Table of Contents
loading

Table of Contents