SBU Cold commissioning

Set SBU parameter
Use the standard AI2 as the RSYC-01 board BUF_OUT signal interface. Select AI2
unit selection to V on the front of the BCON.
Set parameters for MSS and MB control.
Set following parameters via drive startup:
Drive Parameter
16.01 Module 3
type
12.25 AI2 unit
selection
12.27 AI2 min
12.28 AI2 max
16.19 DIO3 function
16.21 DIO3 output
source
16.24 DIO4 function
16.26 DIO4 output
source
16.34 RO1 source
16.37 RO2 source
19.11 Ext1/Ext2
selection
setting
Description
FIO-01
FIO-01 is added and in position 3 for SBU function.
V
Set unit to V
0V
Set AI2 min value. Voltage range of RSYC-01 BUF OUT is 0~10V.
10V
Set AI2 max value
Output
Select DIO3 as output.
If two signals (open and close) are used for MSS control, this
parameter needs to set.
P 85.2.14
MSS open command signal is from SBU function SW bit 14.
If two signals (open and close) are used for MSS control, this
parameter needs to set.
Output
Select the DIO4 as the output.
If two signals (open and close) are used for MB control, this
parameter needs to set.
P 85.2.15
MB open command signal is from SBU function SW bit 15.
If two signals (open and close) are used for MB control, this
parameter needs to set.
P 85.2.12
MSS close command is from SBU function SW bit12
P 85.2.13
MB close command is from SBU function SW bit13
EXT1
Sync to main only works in external control (EXT1 or EXT2).