Scope Of Delivery; Checking The Pre-Conditions For Commissioning - ABB ACS580MV Commissioning Manual

200kw to 6300 kw,3.3kv to 11 kv
Hide thumbs Also See for ACS580MV:
Table of Contents

Advertisement

18 Standard Commissioning Process
No
Name
11
FLUKE F80K-15
[Code: 3ABD00042166]
12
USB to POF cable
[Code:2UBA011603R0002]
13
Ethernet cable, 2.2M FTP
[Code:2UBA010631R0001]

Scope of delivery

After receiving the converter and related equipment, the customer is asked to check all
items against the bill of material and shipping damages. Missing parts should then have
been reported immediately to the carrier and the project responsible ABB organization. All
claims for damage should have been made to the carrier and ABB should have been
notified.
To avoid unnecessary delay of the commissioning, the commissioning engineer must
assure himself that the equipment is complete and intact. Should parts be damaged or
missing the carrier or ABB must be contacted.
It is recommended practice to photograph damaged equipment and send the photographs
to ABB and the carrier.

Checking the pre-conditions for commissioning

In order to ensure uncomplicated and efficient commissioning, it is important that converter
and associated equipment are ready for commissioning. The mechanical and electrical
installation should be done as described in the
(2UBB004520). Reviewing and completing the items in the below list before the
commissioning engineer arrives on site will help achieve this.
Pictures
ACS580MV Hardware Manual
Descriptions
FLUKE Electronic
probe.
Refer to
ACS580MV
Hardware Manual
(2UBB004520)
PEBB FW download
tool
Communication cable,
between PC and
Marshalling PLC.