Installation and commissioning flowchart

Identify the frame size of your drive: R2, R3, R4, R5 or
R6.
Plan the installation.
Check the ambient conditions, ratings, required
cooling air flow, input power connection,
compatibility of the motor, motor connection, and
other technical data.
Select the cables.
Unpack and check the units.
Make sure that all of the necessary option modules
and equipment are present and correct.
Only intact units can be started up.
If the drive is about to be connected to an IT
(ungrounded) system, make sure that the drive does
not have EMC filtering intended for grounded
systems.
Check the installation site.
Install the drive on a wall or in a cabinet.
Route the cables.
Task
Introduction to this manual 17
See
IEC data
(page 106) or
Technical data
(page 105)
Planning the electrical installation
For compliance with the European Union EMC
Directive, see
CE marking
Option manual (if optional equipment is
included)
Unpacking the unit
(page 27)
If the converter was not used for more than one
year, the converter DC link capacitors need to
be reformed. See Converter module capacitor
reforming instructions (3BFE64059629
[English]).
Type code
(page 23)
IT (ungrounded) systems
Before installation
(page 30)
Technical data
(page 105)
Mechanical installation
Routing the cables
(page 58)
For compliance with the European Union EMC
Directive, see
CE marking
NEMA data
(page 119)
(page 35)
(page 128)
(page 60)
(page 27)
(page 128)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-01

Table of Contents