16 Standard Commissioning Process
License for the drive
Digital camera or mobile phone for taking photo

Required tools

The tools list is shown as below, for reference:
No
Name
1
USB transfer Mini USB
cable (3M)
[Code: 3ABD00036680]
2
MC502 (SD memory card)
[Code: 3ABD10058698]
MC503 (SD card adaptor)
[Code: 3AFE10094795]
3
USB XILINX HW-USB-II-G
(Model:DLC10)
[Code: 3ABD00034510]
4
USB-5V power cable
[Code:2UBA011603R0001]
5
Multi-Contact GRIP-CI
[Code: 3ABD00051018]
Pictures
Descriptions
Communication cable,
between PC and
control panel
I/O controller
programing tool
Control Hub
programing tool
External power supply
for power module
4mm Safety Test Clip
CRIP-CI; 1000V, CAT
III/16A