Maretron M-Power CLMD16 Configuration Manual page 39

16 channel dc load controller module
Hide thumbs Also See for M-Power CLMD16:
Table of Contents

Advertisement

____________________________________________________________
Step 1:
Place the Input Signal used to trigger the "Generator Preheat" Circuit into the "Timer Element"
"Delay Signal". Set up the "Timer Element" parameter for "Off Delay" and apply the needed
10s. This will make for when the "Delay Signal" is enabled (after releasing the momentary
"Network Input 4" or turning it "OFF") the circuit will stay On for 10s.
Step 2:
Apply "Timer Output" into the "Input Signal" of the breaker used for the Generator Preheat.
Note:
Because a third party MFD using 127500 Load Controller PGN or any equipment running
Maretron's N2KView® software, by default, will have direct access to control ECB #4 (Breaker
#4), the "Timer Element" shown here will only operate via "Discrete I/O 4". The same "Timer"
behavior may be able to be replicated inside the internal logic of the equipment having direct
control accessibility (N2KView®) or if this logic needs to be accessed by third party MFD,
"Manual Mode" can be enabled severing this direct control access. A combinatory "Logic
Element" can be inserted before the "Timer Element" to enable the same "Timer" behavior via
"Network Input 4" as long as the signal is a momentary type of Input Signal. The mapping for
this exact circuit would look as shown below:
CLMD16 Configuration Guide Rev.1.1
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mpower clmd16

Table of Contents