16-10-200716-10-2007
Issue each of the following commands in turn, followed by Enter, and wait for the Main Menu to
return before going to the next command.
Compare the results of the tests marked " * " with those in the FINAL TEST RECORD and
consult KIPP & ZONEN if there are any discrepancies or problems noted in the tests.
3.10

FINAL INSTALLATION

If the results of the initial tests are within acceptable tolerances, then the Brewer can be moved to
its final location.
At the Brewer Main Menu, issue the command, EX, and the Brewer Operating Program will
1.
terminate.
2.
Turn OFF all Brewer and Computer equipment and remove all interconnecting cables.
Route the Power and Data Cables from the Computer to the Brewer final location.
3.
Disassemble the Brewer-Tracker-Tripod setup , and move them to the final location.
4.
5
At the final location, place the Tripod on a flat surface such that one leg points approximately
toward geographic North.
Use the Tripod "tie-down kit" to secure the tripod against movement due to accidental
6.
bumping or high winds. See Figure 3.6.
Figure 3.6: Securing the Tripod
PN:
routes all printing to the line printer
TE:
confirms that the printer is ON
RL:
prints the firmware error log
PO:
prints instrument constants
RE:
initializes and resets the Brewer
RL:
prints the firmware error log
SR:
* performs an Azimuth Tracker steps/revolution test
AP:
* prints A/D monitor values
HG:
* wavelength calibration (takes about 7 minutes)
SL:
* standard lamp test (takes about 8 minutes)
RS:
* run stop /test (takes about 8 minutes)
DT:
* dead time test (takes about 8 minutes)
FR:
* resets micrometers
HG:
mercury lamp calibration