Compare the results of the tests marked " * " with those in the FINAL TEST RECORD and
consult KIPP & ZONEN if there are any discrepancies or problems noted in the tests.
3.10

FINAL INSTALLATION

If the results of the initial tests are within acceptable tolerances, then the Brewer can be moved to
its final location.
1.
At the Brewer Main Menu, issue the command, EX, and the Brewer Operating Program will
terminate.
2.
Turn OFF all Brewer and Computer equipment and remove all interconnecting cables.
3.
Route the Power and Data Cables from the Computer to the Brewer final location.
4.
Disassemble the Brewer-Tracker-Tripod setup , and move them to the final location.
5
At the final location, place the Tripod on a flat surface such that one leg points approximately
toward geographic North.
6.
Use the Tripod "tie-down kit" to secure the tripod against movement due to accidental
bumping or high winds. See Figure 3.6.
Figure 3.6: Securing the Tripod
PD:
routes all printing to the hard drive
TE:
prints temperature and humidity
RL:
prints the firmware error log
PO:
prints instrument constants
RE:
initializes and resets the Brewer
SR:
* performs an Azimuth Tracker steps/revolution test
HP:
* grating synchronisation
HG:
* wavelength calibration (takes about 7 minutes)
RS:
* run stop /test (takes about 8 minutes)
SL:
* standard lamp test (takes about 8 minutes)
DT:
* dead time test (takes about 8 minutes)
AP:
* prints A/D monitor values
FR:
resets micrometers
MKIII OPERATOR'S MANUAL
3. BREWER SYSTEM SETUP
33