Physical Inspection - GE LOGIQ P6 Service Manual

Hide thumbs Also See for LOGIQ P6:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5245279, R
IRECTION
EVISION
10-5-4-2
Air Filter Cleaning
Table 10-11 Air Filter Cleaning - frequency varies with your environment
Step
Remove Filter
1
2
3
NOTE:
For your convenience or of the air filter is too dirty, replacement filters are available. refer to
Chapter 9 for the air filter replacement part number.
10-5-5

Physical Inspection

Table 10-12 Physical Checks
Step
1
2
Scratches & Dents Inspect the console for dents, scratches or cracks.
3
Control Panel
Control Panel
4
5
Wheels & Brakes
6
7
8
9
Op Panel Lights
10
11
10 - 10
3
Item
refer to Chapter 8 for air filter location and removal instructions.
Cover
The filters can be cleaned in sprinkling water, or they can be dusted with a vacuum cleaner. If the filter
Clean Filter
is metal wash and/or vacuum. If the filter is fiber or plastic vacuum or replace.
Install Filter
Install the clean filter.
Item
Verify that all system labeling is present and in readable condition. refer to the LOGIQ™ P6 User
Labeling
Manual for details.
Inspect keyboard and control panel. Note any damaged or missing items.
Verify ease of control panel (Operator I/O Panel) movement in all acceptable directions. Ensure that
Movement
it latches in position as required.
Check all wheels and casters for wear and verify operation of foot brake, to stop the unit from moving,
and release mechanism. Check all caster locks and caster swivel locks for proper operation.
Cables &
Check all internal cable harnesses and connectors for wear and secure connector seating. Pay
Connectors
special attention to footswitch assembly and probe strain or bend reliefs.
Shielding &
Check to ensure that all EMI shielding, internal covers, air flow panels and screws are in place.
Covers
Missing covers and hardware could cause EMI/RFI problems while scanning.
External I/O
Check all connectors for damage and verify that the labeling is good.
Check for proper operation of all operator panel and TGC lights.
Monitor Light
Check for proper operation of any monitor lights if available.
External
Check for proper operation of any external microphones by recording an audio test.
Microphone
Section 10-3 - Maintenance Task Schedule
LOGIQ™ P6/P6 P
Description
Description
S
M
RO
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents