GE LOGIQ P6 Service Manual page 471

Hide thumbs Also See for LOGIQ P6:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5245279, R
IRECTION
EVISION
10-6-9-3Meter Procedure Using Probe Adapter (cont'd)
6.) Set the meter's "FUNCTION" switch to EXTERNAL position.
7.) Add the saline probe and the imaging area of the probe into the saline bath.
8.) Have unit power ON for the first part; turn it OFF for the second half.
9.) Depress the ISO TEST rocker switch and record the highest current reading.
10.)Follow the test conditions described in
11.)Keep a record of the results with other hand copies of PM data.
3
Figure 10-10 Transducer Source Leakage Current Test
Section 10-6 - Electrical Safety Tests
LOGIQ™ P6/P6 P
Table 10-23
for every transducer.
S
M
RO
ERVICE
ANUAL
10 - 25

Advertisement

Table of Contents
loading

Table of Contents