Ap950 Transbox Assy Function Validation Procedure; Fuse Set Function Validation Procedure; Arpii Assy Function Validation Procedure - GE LOGIQ P6 Service Manual

Hide thumbs Also See for LOGIQ P6:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5245279, R
IRECTION
EVISION
4-9-13

AP950 Transbox Assy Function Validation Procedure

1.) Turn on the system. Refer to the
to check AP950 Assy function. The system must show correct operation as described on sequence.
2.) Check the peripheral operation. Refer to the
confirm the peripheral operation. All peripheral must work correctly as described Section 4-5.
4-9-14

Fuse set Function Validation Procedure

1.) Turn on the system. Refer to the
Assy function. The system must show correct operation as described on sequence.
2.) Check the peripheral operation. Refer to the
peripheral must work correctly as described Section 4-5.
4-9-15

ARPII Assy Function Validation Procedure

1.) ARPII Assy function can be validated by the result of 'Peripheral Test'. Once ARii Assy is replaced,
do peripheral test in order to confirm the successful installation. Refer to the
Checks" on page
3
3-5-1 "Power On/Boot Up" on page 3-11
3-5-1 "Power On/Boot Up" on page 3-11
4-21.
Section 4-9 - Board Function Checks
LOGIQ™ P6/P6 P
Section 4-5 "Peripheral Checks" on page 4-21
Section 4-5 "Peripheral Checks" on page
S
M
RO
ERVICE
ANUAL
for power up sequence
to
sequence to check AP950
4-21. All
Section 4-5 "Peripheral
4 - 47

Advertisement

Table of Contents
loading

Table of Contents