GE H
EALTHCARE
D
5394141, R
IRECTION
EVISION
8-2-30
P3RLY / P2RLY Assy & P2RLY with Dummy
8-2-30-1
Tools
•
Common pilIips screwdrivers
8-2-30-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-30-3
Removal procedure
1.) Remove the side right cover. Refer to the
2.) Remove the side left cover. Refer to the
3.) Remove the Front Cover. Refer to the
4.) Remove the ASIG Board. Refer to the
5.) Unscrew 8 screws (1-8) and remove the metal cover.
6.) Unscrew 6 screws (1-6) and remove the PCB.
8-76
5
(1)
(2)
(3)
(4)
Figure 8-111 RLY Cover
(1)
(4)
Figure 8-112 Screws of the RLY board
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-16 "Side Right Cover" on page
8-2-15 "Side Left Cover" on page
8-2-17 "Front Cover" on page
8-2-35 "ASIG Assy" on page
(8)
(7)
(6)
(5)
(2)
(3)
(6)
(5)
LOGIQ™ P5 S
M
EVICE
ANUAL
8-52.
8-51.
8-53.
8-86.