GE H
EALTHCARE
D
5394141, R
IRECTION
EVISION
8-2-7-3
Removal procedure (cont'd)
5.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Table 8-8
Service Manual
Section
Section 4-3-1
Section 4-3-2
Section 4-7-1
Section 4-3-4
Section 4-3-5
Section 10-5-2
8-2-7-4
Mounting Procedure
Install the new parts in the reverse order of removal.
5
Functional Tests
Functional Test / Diagnostic Test
Power On/Boot Up
Power Off / Shutdown
Main Keyboard Assy Function Validation
System B/M-Mode Checks
System CFM and PWD Checks
Functional Checks (See Also Chapter 4)
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
Procedure
5394141, Rev 1+, Section 8-2-7. Equipment
passed all required tests and is ready for use. "
LOGIQ™ P5 S
M
EVICE
ANUAL
Debrief Script
"Service Manual, Direction
8-39