Removal procedure (cont'd)
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Table 8-5
Service Manual
Section
Section 4-3-1
Section 4-3-2
Section 4-8-8
Section 10-5-5
8-2-4-4
Mounting Procedure
Install the new parts in the reverse order of removal.
5
Functional Tests
Functional Test / Diagnostic Test
Power On/Boot Up
Power Off / Shutdown
Flexible LCD Arm Function Validation
Physical Inspection
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
5394141, Rev 1+, Section 8-2-4. Equipment
passed all required tests and is ready for use. "
Procedure
LOGIQ™ P5 S
M
EVICE
ANUAL
Debrief Script
"Service Manual, Direction
8-11