GE LOGIQ P5 Service Manual page 314

Hide thumbs Also See for LOGIQ P5:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5394141, R
IRECTION
EVISION
8-2-25-3
Removal procedure (cont'd)
4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Table 8-26
Service Manual
Section
Section 4-3-1
Section 4-3-2
Section 4-8-1
Section 10-5-5
8-2-25-4
Mounting Procedure
Install the new parts in the reverse order of removal.
8-68
5
Functional Tests
Functional Test / Diagnostic Test
Power On/Boot Up
Power Off / Shutdown
Cover Parts Function Validation
Physical Inspection
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
LOGIQ™ P5 S
EVICE
Debrief Script
"Service Manual, Direction
5394141, Rev 1+, Section 8-2-25. Equipment
passed all required tests and is ready for use. "
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents