Having a partial inspection carried out

Only suitably trained specialists should carry out a partial inspection of
– the multiple-disc brake,
– the plug connections between the hydraulic motor and the multiple-disk
brake,
– the plug connections between the multiple-disk brake and transmission
unit
and be permitted to replace parts with signs of wear.

Having a general inspection carried out

When carrying out the general inspection of the hoists, also observe the
information contained in Measures required for winch monitoring , p. 5 - 21.
The general inspection involves removing the transmission and sending it
to the manufacturer to be examined.
For transmissions that have undergone a general overhaul, an oil change
must be carried out after 200 and 1,000 operating hours;
tions , P. 4 - 1.
3 302 577 en
Y 3
Y 6
à
Run-in regula-
Maintenance manual
GMK7450

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GROVE GMK7450 and is the answer not in the manual?

Table of Contents