Hyundai 250D-9 Manual page 188

Table of Contents

Advertisement

Loosen slightly all wheel mounting.
·Tools : Socket 22 mm
Torque wrench
Extension bar
Lift the machine with a jack.
Loosen all wheel mounting nuts and replace
the tire.
(3) (3)
Direction of tire to be installed
Direction of tire to be installed
Be careful that the valve should be facing the
outside.
(4)
(4)
Mounting of tire
Mounting of tire
Lightly tighten nuts as shown in the illustration.
Lower the jack after tire is replaced.
Tighten nuts according to the specified tighten
torque.
·Front : 33~37 kgf·m (239~268 ibf·ft)
·Rear : 60~65 kgf·m (434~470 ibf·ft)
27)
27)
STORING TIRES AFTER REMOVAL
STORING TIRES AFTER REMOVAL
As a basic rule, store the tires in a warehouse
which unauthorized persons cannot enter. If the
tire are stored outside, always erect a fence
around the tires and put up "No Entry" and other
warning signs that even young children can
understand.
Stand the tire on level ground, and block it
securely so that it cannot roll or fall over.
If the tire should fall over, get out of the way
quickly. The tires for the industrial truck are
extremely heavy, so trying to hold the tire may
lead to serious injury.
Block
7-40
Torque wrench
160D7MI37
Valve
160D7MI38
10
1
8
3
6
5
4
7
9
2
160D7MI39
60 - 70°
73036MI20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents