ABB ACS880+N5350 User Manual page 217

Cooling tower drives
Table of Contents

Advertisement

D.3 Necessary Tools
• Drill and drill bits
• Screwdriver and/or wrench with bits. The drive cover has Torx screws.
D.4 Moving the Drive
Move the transport package by pallet truck to the installation site.
D.5 Unpacking and Examining the Delivery (Frames R1 to R5)
This illustration shows the layout of the transport package. Examine that all items are present and there are no signs of
damage. Read the data on the type designation label of the drive to make sure that the drive is of the correct type.
Item
To unpack:
• Cut the straps (10).
• Remove the top cardboard cover (11) and cushions (6 - 9).
• Lift the cardboard sleeve (5).
• Lift the drive.
D-2 Mechanical Installation
7
7
2
2
3
3
10
10
8
8
Description
1
Drive with factory installed options.
Control cable grounding shelf. Romex
connectors in IP21 frames R1 to R3
in a plastic bag inside the cable entry
box.
2
Manuals CD
3
Printed quick guides and manuals,
multilingual residual voltage warning
sticker
4
Cardboard tray
-
-
Figure D-3
11
6
6
12
1
1
5
5
9
9
4
4
Table D-1
Item Description
5
Cardboard sleeve
6 - 9 Cushions
10
PET straps
11
Top cardboard cover
12
Hood included with option +B056
3AXD50000011888

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs880-01-24a3-2+n5350Acs880-01-031a-2+n5350Acs880-01-046a-2+n5350Acs880-01-061a-2+n5350Acs880-01-075a-2+n5350Acs880-01-087a-2+n5350 ... Show all

Table of Contents