Checking Readiness For Operation; Connecting The Test Lung - Dräger Carina Instructions For Use Manual

Sub-acute care ventilator
Hide thumbs Also See for Carina:
Table of Contents

Advertisement

Checking readiness for operation

After the device is switched on or after the breath-
ing circuit is changed, the operational readiness of
the device must be verified by means of the device
check.
The checklist on pages 60 and 61 can be copied for
documentation purposes.
 Check the test steps in the copied checklist
once they have been successfully completed.
CAUTION
Do not use the device unless the device check
was successful.
The following functions are tested:
– LEDs, displays and alarm tone
– Upper alarm limit Paw
– Lower alarm limit Paw
– Apnea ventilation

Connecting the test lung

Use only the test lungs specified in the list of acces-
sories.
 Connect the appropriate test lung to the breath-
ing circuit.
Instructions for use Carina SW 3.2n
Getting started
59

Advertisement

Table of Contents
loading

Table of Contents