ASCOM IP-DECT Base Station Installation And Operation Manual page 25

Hide thumbs Also See for IP-DECT Base Station:
Table of Contents

Advertisement

Installation and Operation Manual
IP-DECT Base Station & IP-DECT Gateway
Figure 26.
Figure 12. Install the IPBL
The main steps of the installation is described below:
1
Install the IPBL in a standard 19'' rack.
2
Pin the cables, see
3
Connect the cables in the following order:
• Ethernet cable (1)
• Synchronization cable (sync ring, reference sync) (2)
• Base station cable (RFP cable) (3)
IMPORTANT: The connected RFPs must not be connected to protective earth.
4
Attach the power cable, see
5
Monitor the total current consumption from the GUI. See
page 59. Make sure it not exceeds the following values:
• Max current consumption is 4,0 A when supplied with 110/230 VAC.
• Max current consumption is 5,2 A when supplied with 48 VDC.
Note: The IPBL current consumption is 0,3 A and is included in max current
consumption.
For more information of power consumption of the RFPs, see
Power Consumption
2007-06-18/ Ver. E
base station
01
lan
synchronization
reference
1
2
ring in
ring out
in
out
09
1
2
5.2 Pin the IPBL Cable
5.3 Power the IPBL
on page 69.
02
03
04
05
06
07
08
10
11
12
13
14
15
16
3
on page 21.
on page 23.
7.11.5 Environment
Appendix B: RFP
TD 92372GB
on
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip-dect gateway

Table of Contents