ASCOM IP-DECT Base Station Installation And Operation Manual page 11

Hide thumbs Also See for IP-DECT Base Station:
Table of Contents

Advertisement

Installation and Operation Manual
IP-DECT Base Station & IP-DECT Gateway
Figure 5.
Base station LED
Not lit
Flashing
Steady
Figure 6.
Base station LED
Not lit
Flashing
Steady
Figure 7.
Sync/Ref sync LED
Not lit
Steady
Figure 8.
Sync/Ref sync LED
Not lit
Flashing
Steady
Figure 9.
Lan LED
Not lit
Flashing
Steady
Figure 10.
Lan LED
Not lit
Steady
2007-06-18/ Ver. E
Description
No U
link established.
PN
U
link established (activated state), RFP is not
PN
operational.
RFP is fully initialised and operational.
Description
No speech activity in RFP.
All speech channels occupied in RFP.
Speech activity in RFP.
Description
No sync communication established.
Communication established.
Description
Sync port not selected as input sync source.
Sync port selected as input sync source but the
sync signal is not in sync.
Sync port selected as input sync source and the
sync signal is in sync.
Description
No link.
Link present and network activity.
Link present, but no network activity.
Description
10 Mbps operation.
100 Mbps operation.
TD 92372GB
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip-dect gateway

Table of Contents