Verifying Correct Operation - Broadcom G610 Hardware Installation Manual

Table of Contents

Advertisement

53-1004408-11 Installation Guide
Perform the following steps to modify the domain ID.
a) Disable the switch by entering the switchDisable command.
b) Enter the configure command. The command prompts display sequentially; enter a new value or press Enter
to accept each default value.
c) Enter y after the Fabric param prompt.
Fabric param (yes, y, no, n): [no] y
d) Enter a unique domain ID (such as the domain ID used by the previous switch, if still available).
Domain: (1..239) [1] 3
e) Complete the remaining prompts or press Ctrl+D to accept the remaining settings without completing all the
prompts.
f) Re-enable the switch by entering the switchEnable command.

Verifying Correct Operation

Perform the following steps to verify the correct operation of the device.
1. Check the LEDs to verify that all components are functional.
2. Verify the correct operation of the device by entering the following commands from the workstation.
Command
errDump
fanShow
historyShow
psShow
switchShow
tempShow
The switchShow command provides the following information about the device and port status.
switch70> switchshow
switchName:
sb_70
switchType:
170.0
switchState:
Online
switchMode:
Native
switchRole:
Subordinate
switchDomain:
70
switchId:
fffc46
switchWwn:
10:00:00:05:1e:65:79:04
zoning:
ON (PERF_CFG)
switchBeacon:
OFF
Fabric Name:
abcfabric
HIF mode:
OFF
Broadcom
Displays any errors
Displays fans status and information
Displays the device history
Displays power supply status and information
Displays switch status and information
Displays temperature status and information
®
Brocade
G610 Switch Hardware Installation Guide
Description
53-1004408-11
44

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the G610 and is the answer not in the manual?

Table of Contents