Chapter 2 Installation And Setup; Packaging Contents; Instrument Installation - Thermo Scientific Gibco CTS Rotea User Manual

Counterflow centrifugation system
Table of Contents

Advertisement

2

Packaging contents

• Rotea
instrument
• Hanger posts (2 off)
• Mains plug IEC cables (USA/EUROPE/AUSTRALIA)
• Pre-fitted mains fuses (2 x 5A)
• USB-C (male) to USB-C (female)
• Dell
2‑in‑1 laptop tablet (this will be in a separate carton)

Instrument installation

• Remove outer packaging
• Prepare bench space to receive Rotea
that there is easy access to the "On/Off" switch and mains IEC connector at the rear of the
instrument
CAUTION! The Rotea
it is the user's responsibility to ensure all safety hazards and functional risks are addressed including
adequately supporting the weight of the instrument and having sufficient wheel span so that both the
trolley and instrument are stable.
• Ensure that the bench is stable and level to within ±0.4" (10 mm)
• Position the instrument on the bench with a minimum of 4" (10 m) between the rubber feet and the
edges of the bench
CAUTION! The Rotea
appropriate care and seek assistance if necessary when lifting or moving the instrument. Lift the
instrument, holding between the rubber feet on the bottom of the instrument.
CAUTION! Do not position the instrument is such a way that it would make it difficult to disconnect
the power cord from the power inlet.
CAUTION! If using an alternate mains cable, ensure it is rated for at least 10A.
16
instrument unit (see "Working space"
instrument should be installed on a stable bench. If a mobile set up is used,
instrument weighs 40 lbs (18 kg) excluding hanger bag posts. Use
Installation and setup
CTS
Rotea
Counterflow Centrifugation System User Guide
on page
10) ensuring

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A44769

Table of Contents