Toshiba 4400 Series Installation And Operation Manual page 35

Three phase - 15/20/25/30/50/80/100 kva
Table of Contents

Advertisement

1. The UPS generates and can radiate radio-frequency energy during operation. Although RFI noise filters are installed
inside of the unit, there is no guarantee that the UPS will not influence some sensitive devices that are operating near
by. If such interference is experienced, the UPS should be installed further away from the affected equipment and/or
powered from a different source than that of the installed equipment.
2. The user should provide over-current protection for hardwired UPS systems between the UPS output and the load
input.
3. After ensuring that all power sources are turned "OFF" and isolated in accordance with established lockout/tagout
procedures, connect the power source wiring of the correct voltage to the input terminals of the UPS.
NOTE: Ensure the input phasing is connected in clockwise rotation (CW). UPS internal circuitry is designed
to disable further UPS operation if the input phasing is installed in counter-clockwise rotation (CCW).
4. Connect the output terminals of the UPS to the load (refer to NEC Article 300 – Wiring Methods and Article 310 – Con-
ductors For General Wiring). Size the branch circuit conductors in accordance with NEC Table 310.16 as published
9/2008.
Conductor Routing and Grounding
1.
Use separate metal conduits for routing the input power, output power, and control circuits.
2.
Follow the wire size and tightening torque specifications.
3.
Always ground the unit to reduce the potential for electrical shock and to help reduce electrical noise.
4.
A separate ground cable should be run inside the conduit with the input power, output power, and control circuits.
4400 Series Installation and Operation Manual – 64527-008
WARNING
METAL CONDUIT IS NOT AN ACCEPTABLE GROUND.
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents