EZ-ACCESS PATHWAY HD Code Compliant Modular Access System Installation Manual page 50

Hide thumbs Also See for PATHWAY HD Code Compliant Modular Access System:
Table of Contents

Advertisement

5.6.7. Place the assembly into the space between the ramp side rails. Make sure the legs
5.6.8. Use the two smaller holes in the barrier attachment plates to drill two 1/4" or
5.6.9. Connect the barrier attachment plates to the ramp side rails using 1/4"-20 x 3/4" long
5.6.10. For the mid rail, first measure the distance between the frame posts at the turn
5.6.11. Using a metal file, remove all sharp edges from cutting.
PATHWAY HD Code Compliant Modular Access System Installation Manual
of the barrier attachment plates with the two smaller holes are captured under the
upper hooks and in contact with the ramp side rails. Move the ramps slightly if
needed. Level the barrier with respect to the platform and clamp the attachment
plates to the side rails, if possible, before drilling (FIG. 5.22).
9/32" holes through each ramp side rail (FIG. 5.22).
ribbed neck carriage bolts, 1/4"-20 nylon insert locknuts, and 1/4" flat washers. Orient
the head of the carriage bolt on the ramp side as shown (FIG. 5.22).
back, and then cut the 1-1/2" x 2" mid rail to the measured length less 5/8" to
account for threaded inserts and attachment plates which will be installed in the
following steps.
FIG. 5.22
Page 50 of 92

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PATHWAY HD Code Compliant Modular Access System and is the answer not in the manual?

Table of Contents