4.7.6. Install 5/16"-18 x 1" long hex bolts through a 5/16" flat washer for the top rail, mid
4.7.7. Tighten all fasteners securely, including the angle post set screws under the platform
4.8. CONVERT TWO-LINE PLATFORM RAILS TO PICKETED GUARDS
4.8.1. To convert a two-line rail to a picketed guard in the field, leave the top rail in place but
4.8.2. Remove attachment bolts for mid rail and barrier on both sides. Remove mid rail and
4.8.3. Install the picketed guard in the same manner described in 'ASSEMBLE TWO-LINE
4.8.4. Repeat for all sections requiring conversion.
PATHWAY HD Code Compliant Modular Access System Installation Manual
rail, and platform angle post of the "first" frame and through the angle post of the
"first" frame only for the barrier (do not use a flat washer on the lowermost hole) into
the threaded inserts in the top rail, mid rail and barrier of the "second" frame (FIG.
4.12).
deck and the assembly fasteners of the two-line rails or picketed guards which were
assembled loosely in an earlier section.
FIG. 4.12
loosen the attachment bolts on both sides.
barrier.
PLATFORM RAILS AND PICKETED GUARDS' section.
Page 34 of 92
Need help?
Do you have a question about the PATHWAY HD Code Compliant Modular Access System and is the answer not in the manual?