5.3. TWO-LINE RAIL TOP RAIL
5.3.1. Insert a 2-15/16" ring joiner in the frame top rail and install an adjustable elbow with
5.3.2. Assemble an adjustable elbow with threaded insert in the uppermost hole in the
5.3.3. Tighten only enough to hold the elbow in place.
5.3.4. Insert a 2-15/16" ring joiner in the opposite end of the adjustable elbow with threaded
FIG. 5.9
FIG. 5.10
PATHWAY HD Code Compliant Modular Access System Installation Manual
another 2-15/16" ring joiner as shown (FIGs. 5.9 and 5.10).
platform angle post where the closure will connect using a 5/16"-18 x 1" long hex
bolt and 5/16" flat washer.
5.3.2.1. For a 5' platform side, use the hole shown in FIG. 5.9. For larger
platforms use the hole shown in FIG. 5.10.
insert (FIGs. 5.9 and 5.10).
Page 40 of 92
Need help?
Do you have a question about the PATHWAY HD Code Compliant Modular Access System and is the answer not in the manual?