2.2.5 Basic Operations for Engineering Commissioning
2.2.5.1 Basic Operations
Basic Operations
Starting engineering
Press and hold "SW7" on the master unit
commissioning
for more than five seconds.
Selecting
Press "SW4" and "SW5" simultaneously
no-wired-controller
in any commissioning progress after the
commissioning mode
unit enters the commissioning status.
In engineering commissioning status,
Quitting engineering
press and hold "SW7" for more than five
commissioning
seconds on the master unit to quit
commissioning.
In engineering commissioning status,
press "SW6" on the master unit to retain
Pausing engineering
the previous commissioning completion
commissioning
phase of the current commissioning
phase.
Continuing
In engineering commissioning pause
engineering
status, press "SW6" on the master unit to
commissioning
continue engineering commissioning.
2.2.5.2 Restoring Factory Settings
Restoring
Setting Method
Factory Settings
Press and hold "SW8"
Restoring
on the master unit for
setting 1
more than 10 seconds.
Press and hold "SW3"
Restoring
and "SW8" on the
setting 2
master unit for more
than 10 seconds.
Press and hold "SW5"
Restoring
and "SW8" on the
setting 3
master unit for more
than 10 seconds.

3 Commissioning Process

Note:
① It is forbidden to directly connect the compressor with power supply and forcibly power it on
during commissioning and maintenance.
② Engineering commissioning operations must be performed on the GMV5E serial unit. Otherwise,
GMV5E DC INVERTER VRF UNITS SERVICE MANUAL
Operation Method
Prompt for
Successful Settings
All LEDs blink for
three seconds.
All LEDs blink for
five seconds.
All LEDs blink for
seven seconds.
95
Remark
——
In this mode, the system does not detect the
communication status between the IDU and
wired controller any more. Commissioning
can be performed on the IDU without
configuring the wired controller.
——
This function is valid after step 9. For
example, if receiving a pausing engineering
commissioning signal during the process of
"10. Pre-startup ODU valve status judging
phase" in step 11, the system will restore
the completion phase of "9. Pre-startup
refrigerant judging phase" in step 10.
——
Remark
All factory settings of the ODU are restored
and the unit waits for re-commissioning.
Re-commissioning is not required. The
number of outdoor and IDUs is memorized.
Addresses of outdoor and IDUs are all
cleared. All the other function settings are
cleared.
Re-commissioning is not required. The
number of outdoor and IDUs is memorized.
Addresses of outdoor and IDUs retain the
preceding settings. All the other function
settings are cleared.