Gree GMV5E Series Service Manual page 284

Dc inverter vrf units
Table of Contents

Advertisement

GREE
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
1. Loosen the hooks at
the bottom of the
electric box and the
screws.
2. Remove the electric
box.
3. Disassemble the heat
exchanging board.
4. Remove the heat
exchanging board.
GMV5E DC INVERTER VRF UNITS SERVICE MANUAL
Heat exchanging board
Diagram
280
Operation Procedure
● Remove the upper and lower front
panels.
● Loosen the hooks at the bottom of
the electric box.
● Use a screwdriver to unscrew the
electric box.
●Disconnect internal and external
connecting lines of the electric box.
●Protect the internal parts during the
disassembly.
●Heat the connecting pipes of the
heat exchanging board by acetylene
welding and then remove the pipes.
Note: Avoid nearby parts from being
burnt during welding. The joints of the
board must be welded with copper
plated steel. Ensure welding quality.
●Unscrew the support of the heat
exchanging board, and remove the
support and board.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents