Commissioning; Check Before Startup - Gree Versati III GRS-CQ4.0Pd/NhG-K Owner's Manual

Hide thumbs Also See for Versati III GRS-CQ4.0Pd/NhG-K:
Table of Contents

Advertisement

Air-to-water Heat Pump

18. Commissioning

18.1 Check before startup

For safety of users and unit, the unit must be started up for check before debugging. The procedures are as
below:
No.
If the contents of Application for Installation of this Unit by Installer are real. If not, debugging will be
1
2
3
No.
1
Is appearance of the unit and internal pipeline system ok during conveying, carrying or installation?
2
Check the accessories attached with the unit for quantity, package and so on.
3
Make sure there is drawings in terms of electricity, control, design of pipeline and so on.
4
Check if installation of the unit is stable enough and there is enough space for operation and repair.
5
Completely test refrigerant pressure of each unit and perform leakage detection of the unit.
6
Is the water tank installed stably and are supports secure when the water tank is full?
7
Are heat insulating measures for the water tank, outlet/inlet pipes and water replenishing pipe proper?
Are the nilometer of water tank, water temperature indicator, controller, manometer, pressure relief valve
8
9
Does power supply accord with the nameplate? Do power cords conform to applicable requirements?
Is power supply and control wiring connected properly according to wiring diagram? Is earthing safe? Is
10
11
Are connection pipe, water pump, manometer, thermometer, valve etc. are installed properly?
12
Is each valve in the system open or closed according to requirements?
13
14
Is Installation Check-up Table completed and signed by the installation contractor?
Attention: If there is any item marked with ×, please notify the contractor. Items listed above are just for reference.
Is the written amending report which should be signed after communication provided to installer?
and automatic discharge valve etc. installed and operated properly?
each terminal stable?
General Evaluation: Debugging □
a: Power supply and electric control system
c: Heating problems of Unit
e: Pipeline problem
incurred by any problem which is not solved immediately.
Submit schedule of amending reports to installer.
refused.
Pre-check
Amendment □
b: Loading calculation
d: Noise problem
Yes ( )
No ( )
45
SPLIT TYPE
f: Others