Gree GMV5E Series Service Manual page 281

Dc inverter vrf units
Table of Contents

Advertisement

GREE
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
6. Fix and wire the
electric box.
7. Check and install the
front panels.
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
1. Loosen the hooks at
the bottom of the
electric box and the
screws.
GMV5E DC INVERTER VRF UNITS SERVICE MANUAL
Oil separator
Diagram
Gas/liquid separator
Diagram
277
Operation Procedure
●Put the electric box back to
original position and screw it.
● Connect all lines.
●Check various parts and
connecting lines.
● If no problem is found, hook the
front panels and tighten the
screws.
Operation Procedure
● Remove the upper and lower
front panels.
● Loosen the hooks at the bottom
of the electric box.
● Use a screwdriver to unscrew
the electric box.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents